This job was almost done when my guy got a better offer. I think all materials are here except for a belt sander. It's a small space-- only 6'x7', but with a few tricky cuts. The mortar needs to be sanded smooth and then the floor needs to be resealed with something which I think I have. Finally, the vinyl needs to be cut according to a template. (That's what they told me at Lowe's anyway). This is a two-hour job for someone who knows what he/she's doing.